Customers' projects

<b>PEM HQ Building</b>  - France

PEM HQ Building - France

Movie of the week

Methods of member selection

ROBOT Millennium
Methods of member selection

 

ROBOT Millennium v. 18.0 Maintenance Pack 4

New options and possibilities:

Seismic calculations:

  • Added possibility of seismic calculations according to Eurocode EC8 – Portuguese NAD

RC modules:

  • New code DM 9/1/96 – implemented possibility of calculations of RC element reinforcement according to the Italian code DM 9/1/96;
  • Provided (real) reinforcement of slabs – implemented possibility to define reinforcement of slabs with reinforcement in one layer and with unidirectional reinforcement;
  • Spread footings:
    • presentation of bending moments acting on the spread footing
    • calculations of the required (theoretical) reinforcement before the punching reinforcement (?).

Steel connections

  • New connection PN-90/B-03200 – fixed column base;
  • New connection PN-90/B-03200 – concrete column base;
  • Warning messages:
    • supplemented with display of numerical values of described quantities;
  • Bolted connections:
    • added possibility of independent symmetrization of spacings and the whole arrangement of bolts.

Removed errors:

Calculation-related problems:

  • Corrected error that resulted in blocking the calculations by means of the “Sparse” method for a structure involving moving loads;
  • Corrected error of incorrect calculations of 3D structures (apparent e.g. in the imbalance of forces and reactions) occurring when supports rotated to the point are present.

Structure edition:

  • Corrected errors of “Open GL” display that imposed deactivation of the graphic card acceleration;
  • Restored work of the “previous selection” option.

Steel member design:

  • Automatic buckling length for mixed structures – correction of the algorithm that imposes disregarding the shell part;
  • PN-90/B-03200:
    • correction of the instability coefficient for asymmetric I-sections,
    • correction of the critical force value for the flexural-torsional buckling of C-sections.

Verification of steel connections:

  • EC3 – fixed beam-column connection:
    correction of errors.

RC design:

  • Beam reinforcement:
    • considered participation of axial forces in calculations of beam shear and cracking,
    • corrected optimization of diameters of the longitudinal reinforcement,
    • ACI: removed error of ignoring the compression reinforcement,
    • BAEL: corrected generation of triangular and open stirrups,
    • PN: removed error in evaluating the torsional and shear capacities;
  • Spread footings:
    • corrected selection of the spread footing shape due to lifting,
    • PN: correction of diameters of transverse reinforcement.